European Central Bank Building
European central bank frankfurt award.
European central bank building. Prix awarded hessian cultural prize for european central bank frankfurt. After completion of the construction works the ecb began operating in november 2014 from a modern and functional building that was built to meet its specific. Picture alliancedpa european central bank. On november 1st wolf d.
The european central bank ecb. Our main task is to maintain price stability in the euro area and so preserve the purchasing power of the single currency. Visiting the european central bank. Prix will be awarded the prestigious hessian culture prize for coop himmelblaus design of the new european central bank ecb in.
The european central bank ecb is the central bank of the 19 european union countries which have adopted the euro. New european central bank building. Download hochwertiger bilder die man nirgendwo sonst findet. As a towering new landmark in eastern frankfurt the building of the european central bank ecb represents a visual.
The ecbs new home is a modern building for a modern central bank mario draghi president of the ecb the ecb chose the site of the grossmarkthalle frankfurts former wholesale market hall to build its new premises. Visits to the ecb and our visitor centre are currently suspended as a precautionary measure against the risks associated with the spread of the coronavirus covid 19. The european central banks two glass towers in frankfurt am main are ready for occupancy. European central bank frankfurt tower building.
We will update this page as soon as the situation has been reassessed and visits to our institution are possible again. It is located in ostend east end frankfurt germanythe premises include the former wholesale market hall grossmarkthalle a new 185165 m twin skyscraper and a new low rise building to connect the twoit was completed in 2014 and was officially opened on 18 march 2015. It is a gigantic three dimensional symbol for frankfurt germany and the european union. The main construction on a 120000 m2 total site area began in october 2008 and it was expected that the building would become an architectural.